Actions from Call:
- AP – check if the IRAC Team Guide is still current or needs updating
- RN – prepare some slideĀ on the CLI integration for the Exec call
- NA – arrange to meet with CLI to review financial management of IRAC funds
- RN – prepare some bullet points on IRAC objective for 2011 for CLI
- RN – Lead discussion at the Exec call on the proposed changes to the EU Liaison WG
- RN – check to see if MH will take over leadership of the CMWG
- RN – follow up with SL regarding running of the Lep WG
- RN – follow up on WG updates for the Exec call
- AP – draft agenda for next Exec call